Kingsley Roofing Ltd Blog

New-build with Redland integrated Solar PV Tile

October 2010 brought an exciting new project for Kingsley’s Eco Solutions Division as they embarked on a new build for a client in Rustington, West Sussex.

Titled Roof

Kingsley were asked to install a Redland Duoplain concrete interlocking tiled roof, with an integrated Redland Solar PV tile, which  gives a great aesthetic finish.

Redland Solar PV Say:

Installing a roof

Our second generation Photovoltaic (PV) Tile systems have been designed for performance, ease of installation and to blend in with the built environment to minimise the aesthetic impact on the building. They thus offer significant benefits in all three areas over “above the roof” panel systems, where poor installation can compromise the roof structure.

A pitched roof is the ideal surface for solar energy collection for heat and electricity generation since the radiation from the sun is greater than on a flat surface. Even in the UK, and even in winter, our PV systems continue to harness solar energy. Of course, the brighter the sunlight, the higher the output, but our PV systems also work well in normal daylight and even cloudy conditions.

Our solar energy systems are a technical tour de force: innovative and very reliable. But not only that: their aesthetic appeal is just as important. The systems are fully integrated and blend into the roof surface beautifully. They can also be expanded easily at a later date giving you maximum flexibility and minimum inconvenience.

Kingsley Eco Solutions have a sample display of the Redland PV tile, including a working Solar PV system in their Renewable Energy Centre or a special arranged visit can be made for the above project. 01903 227726

This entry was posted on Sunday, October 10th, 2010 at 7:43 am and is filed under Commercial Eco Solutions, Commercial Roofing, Domestic Eco Solutions, Domestic Roofing, Kingsley Group News. You can follow any responses to this entry through the RSS 2.0 feed. You can leave a response, or trackback from your own site.

2 Responses to “New-build with Redland integrated Solar PV Tile”

  1. The best thing about Photovoltaic (PV) Tile system is that it utilizes the solar energy and makes the best use of it.

  2. Thanks for the helpful article. It is also my belief that mesothelioma cancer has an very long latency interval, which means that the signs of the disease might not emerge until finally 30 to 50 years after the primary exposure to asbestos. Pleural mesothelioma, which can be the most common form and has an effect on the area about the lungs, might cause shortness of breath, breasts pains, including a persistent cough, which may lead to coughing up maintain.

Leave a Reply

NFRC logo
CHAS logo
HETAS logo
MCS logo
Construction Line logo
REAL logo
Specialist Roofing
The Kingsley Group